Gateway 9315 Instrukcja Użytkownika Strona 1

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Sprzęt komputerowy Gateway 9315. Gateway 9315 User Manual [en] [fr] Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj

Podsumowanie treści

Strona 1 - User Guide

User GuideGateway 9315 Server

Strona 2 - Contents

5www.gateway.comSystem boardConnectors - right sideCPU 1 socketIDE powerconnectorCPU 1 fan headerCPU 2 socket+12V CPU power connectorFan board connect

Strona 3

95www.gateway.comTo recover the old BIOS:1 Turn on or restart the server.2 Press and hold CTRL+HOME. The old BIOS is recovered.To manually recover the

Strona 4

96www.gateway.com5 Insert a DOS-bootable USB disk-on-key or DOS-bootable CD containing a valid BIOS image.6 Reconnect the power cords and turn on the

Strona 5

97www.gateway.comResetting the BIOSYou can use two methods to clear all BIOS Setup settings and return them to the factory defaults: Press the power

Strona 6 - Chapter 1

98www.gateway.com7 Place a jumper across the Force Erase pins (1-2) of jumper J1H5 (CMOS Clr).8 Reconnect the power cords and turn on the server. The

Strona 7 - Control panel

99www.gateway.com3 Remove the jumper across pins 2-3 of jumper J1H2 (Pass Clr), then place the jumper across pins 1-2.4 Reconnect the power cords and

Strona 8 - I/O panel

100www.gateway.com

Strona 9 - Interior

Chapter 6101Troubleshooting Getting telephone support and training Interpreting error messages and codes TroubleshootingIf the suggestions in this

Strona 10 - System board

102www.gateway.comTelephone supportBefore calling Gateway Customer CareIf you have a technical problem with your server, follow these recommendations

Strona 11 - Connectors - left side

103www.gateway.comTelephone supportGateway offers a wide range of customer service, technical support, and information services.Telephone numbersYou c

Strona 12 - Getting Help

104www.gateway.comSafety guidelinesWhile troubleshooting your server, follow these safety guidelines: Never remove the top panel while your server is

Strona 13

6www.gateway.comConnectors - left sidePCI riser card (low-profile)PCI riser card (full-height)DIMM slotsBatteryMouse (top)andKeyboardSerial port A hea

Strona 14 - Chapter 2

105www.gateway.comError messagesThese messages often indicate procedural errors such as typing an incorrect keystroke or trying to save a file to a wr

Strona 15 - Setting up the hardware

106www.gateway.com If you do not know the password, you may need to reinstall the software you are trying to access. System startup passwords are st

Strona 16 - Line conditioners

107www.gateway.comTroubleshootingFirst stepsTry these steps first before going to the following sections: Make sure that the power cord is connected

Strona 17

108www.gateway.com Remove the top panel by following the instructions in “Opening the server case” on page 38, then make sure that all cables inside

Strona 18 - ■ Fastener pack (1)

109www.gateway.com4 System board timer not operational. Possible system board malfunction. To eliminate the possibility of an add in-card problem, rem

Strona 19

110www.gateway.comLED informationThe system board in this server includes LEDs that can assist you in troubleshooting your system. See the following t

Strona 20 - Disk guide

111www.gateway.comPOST code checkpointsThe following table shows the checkpoints, LED codes, and task description of events that may occur during the

Strona 21

112www.gateway.com0E GGGOffTesting and initialization of different Input Devices. Also, update the Kernel Variables.Trap the INT09h vector, so that th

Strona 22 - Nut bar or mounting nuts

113www.gateway.com52 Off R G R Update CMOS memory size from memory found in memory test. Allocates memory for Extended BIOS Data Area from base memory

Strona 23 - Installing the bezel

114www.gateway.comBootblock initialization code checkpointsThe Bootblock initialization code sets up the chipset, memory, and other components before

Strona 24

7www.gateway.comGetting HelpIn addition to your operating system’s documentation, you can use the following information resources to help you use your

Strona 25 - Starting your server

115www.gateway.comBootblock recovery code checkpointsThe bootblock recovery code gets control when the BIOS determines that a BIOS recovery needs to o

Strona 26

116www.gateway.comEF OOOGRead error occurred on media. Jump back to checkpoint EB.F0 RRRRSearch for pre-defined recovery file name in root directory.F

Strona 27 - Turning off your server

117www.gateway.comDIM code checkpointsThe Device Initialization Manager (DIM) gets control at various times during BIOS POST to initialize different s

Strona 28

118www.gateway.comBIOSThe settings in the BIOS Setup utility are not retained Replace the CMOS battery. For instructions, see “Replacing the CMOS bat

Strona 29 - Initial hardware settings

119www.gateway.comExpansion cardsYour server does not recognize an expansion card Restart your server. Make sure that you have installed the necessa

Strona 30 - Chapter 3

120www.gateway.comThe master boot record is corrupted In a Windows network operating system, repair the master boot record using FDISK.To repair the

Strona 31 - Caring for your server

121www.gateway.comYour modem does not dial or does not connect Make sure that your server is connected to the telephone line and the telephone line h

Strona 32 - Cleaning the screen

122www.gateway.comYour 56K modem does not connect at 56KCurrent FCC regulations restrict actual data transfer rates over public telephone lines to 53K

Strona 33 - Preparing for system recovery

123www.gateway.comA horizontal line or wire is visible across the monitor screenThe monitor may use thin damper wires, located approximately 1/3 of th

Strona 36 - Identifying your server

Appendix A125Server SpecificationsThe following specifications are for the standard configuration. Your server may contain optional equipment. All spe

Strona 37 - Updating the FRU/SDR

126www.gateway.comSystem specificationsCase size26.46 × 16.93 × 1.7 inches (67.21 × 43 × 4.32 cm) (without handles)WeightVaries by configuration. A fu

Strona 38 - ■ View server documentation

127www.gateway.comSystem board specificationsProcessorDual socket 604 package800 MHz front side busSupports as many as two Intel Xeon CPUs (2.8 GHz mi

Strona 39

128www.gateway.comEnvironmental specificationsThe following specifications identify maximum environmental conditions. At no time should the server run

Strona 40 - Chapter 4

129www.gateway.comAdditional specificationsFor more information about your server, such as memory size, hard drive size, and processor type, visit Gat

Strona 42

Appendix B131BIOS SettingsIf you ever need to restore your BIOS settings, such as after a system board change, a record of the settings will make the

Strona 43 - Opening the server case

132www.gateway.comTo view all BIOS settings:1 Restart your server2 Press F2 when the Gateway logo screen appears during startup. The BIOS Setup utilit

Strona 44 - Closing the server case

133www.gateway.comMax CPUID Value Limit EnabledDisabledHyper-Threading TechnologyEnabledDisabledIntel Speed Step™ Tech AutomaticDisabledIDE Configurat

Strona 45

134www.gateway.comSecondary IDE Slave Selects IDE Device Configuration submenu with additional device details/settingsThird IDE Master Selects IDE Dev

Strona 46

Chapter 29Setting Up Your Server Using your server safely Installing your server into a cabinet Starting and turning off your server Setting up yo

Strona 47 - Removing the air baffle

135www.gateway.comSerial Port B Address Disabled3F8/IRQ42F8/IRQ33E8/IRQ42E8/IRQ3USB ConfigurationUSB Devices Enabled (List of USB devices detected by

Strona 48

136www.gateway.comOnboard NIC 1 ROM DisabledEnabledOnboard NIC 2 (Right) DisabledEnabledOnboard NIC 2 ROM DisabledEnabledSlot 1 Option ROM DisabledEna

Strona 49 - Installing the air baffle

137www.gateway.comDIMM 3B (Information) InstalledNot InstalledDisabledSpareExtended Memory Test 1 MB1 KBEvery LocationDisabledMemory Retest EnabledDis

Strona 50

138www.gateway.comScan User Flash Area DisabledEnabledBoot Device Priority1st Boot Device Varies (Specifies boot sequence from the available devices.

Strona 51

139www.gateway.com1st Drive Varies (Specifies boot sequence from the available devices.)nth Drive Varies (Specifies boot sequence from the available d

Strona 52

140www.gateway.comSecure Mode Hot Key (Ctrl-Alt-)[Z][L]Secure Mode Boot DisabledEnabledFront Panel Switch Inhibit DisabledEnabledNMI Control DisabledE

Strona 53

141www.gateway.comSerial Console FeaturesBIOS Redirection Port DisabledSerial ASerial BBaud Rate 960019.2K38.4K57.6K115.2KFlow Control No Flow Control

Strona 54

142www.gateway.comFSB Error Logging DisabledEnabledHublink Error Logging DisabledEnabledServer (Cont’d)Assert NMI or SERR DisabledEnabledAssert NMI or

Strona 55 - Installing a CD or DVD drive

143www.gateway.comThe following 2nd level submenus are accessed from the submenu indicated in the first column.PXE OS Boot Timeout Disabled5 minutes10

Strona 56

144www.gateway.com3rd and 4th ATA Channels A1-3rd/A2-4th MA1-4th/A2-3rd MNoneBIOS submenu BIOS 2nd level submenuSetting ValueIDE Configuration (Cont’d

Strona 57 - Removing a CD or DVD drive

10www.gateway.comSetting up the hardwareTo make sure that your working environment is safe: Use a clean, dry, flat, stable surface for your server. A

Strona 58

145www.gateway.comPIO Mode Auto01234DMA Mode AutoSWDMA 0-2MWDMA 0-2UWDMA 0-5S.M.A.R.T. AutoDisabledEnabled32Bit Data Transfer DisabledEnabledBIOS subm

Strona 59

146www.gateway.comEmulation Type AutoFloppyForced FDDHard DiskCDROMDevice #n Displayed if a device is detected. Includes a DeviceID string returned by

Strona 60

Appendix C147Safety, Regulatory, and LegalInformation Safety information Legal and Regulatory Information

Strona 61

148www.gateway.comImportant safety informationYour Gateway system is designed and tested to meet the latest standards for safety of information techno

Strona 62

149www.gateway.comImportant Do not use Gateway products in areas classified as hazardous locations. Such areas include patient care areas of medical a

Strona 63

150www.gateway.comRegulatory compliance statementsUnited States of AmericaFederal Communications Commission (FCC)Unintentional emitter per FCC Part 15

Strona 64

151www.gateway.comThe United States Telephone Consumer Protection Act of 1991 makes it unlawful for any person to use a computer or other electronic d

Strona 65

152www.gateway.comUsers should make sure, for their own protection, that the electrical ground connections of the power utility, telephone lines, and

Strona 66

153www.gateway.comLaser safety statementAll Gateway systems equipped with CD and DVD drives comply with the appropriate safety standards, including IE

Strona 67

154www.gateway.comNoticesCopyright © 2005 Gateway, Inc.All Rights Reserved7565 Irvine Center DriveIrvine, CA 92618-2930 USAAll Rights ReservedThis pub

Strona 68

11www.gateway.comProtecting from power source problemsSurge protectors, line conditioners, and uninterruptible power supplies can help protect your se

Strona 69 - Filling empty drive bays

155www.gateway.comIndexAaccessoriessafety precautions 148ACPI runtime checkpoints 117add-in cardsee cardaddingsee installingremovingsee also installi

Strona 70 - Installing memory

156www.gateway.comcleaningcase 26keyboard 27screen 27closingcase 39CMOS batterysee batteryconfiguration jumper 5, 6configuringonboard RAID 61RJ-45 ser

Strona 71 - Memory online sparing

157www.gateway.comeSupport 129Exit menuBIOS Setup utility 92expansion cardsee cardFfan moduleconnector 5, 6location 4filling empty drive bays 64findin

Strona 72 - To install or replace memory:

158www.gateway.comport 3troubleshooting 120LLAN jack 3LEDdiagnostic 110indicators 2, 21information 110system board 110line conditioners 11locationCPU

Strona 73

159www.gateway.comLED 2, 21line conditioners 11main connector 5, 6protecting from surges 11reset button 2source problems 11static electricity 37surge

Strona 74

160www.gateway.comsetting uphardware 10operating system 24safety precautions 10, 26, 148settingsinitial hardware 24Setup utilitysee BIOS Setup utility

Strona 75

161www.gateway.comUuninterruptible power supply (UPS) 12updatingbaseboard management controller firmware 32BIOS 93firmware 32UPS 12USB portsinternal c

Strona 76

162www.gateway.com

Strona 77

A MAN 9315 1U USR GDE R0 01/05

Strona 78

12www.gateway.comUninterruptible power suppliesUse an uninterruptible power supply (UPS) to protect your server from data loss during a total power fa

Strona 79

13www.gateway.comMounting your server into a cabinetThe cabinet mounting hardware included with your server should be used with EIA-310-D standard 4-p

Strona 80 - Replacing a system fan

14www.gateway.comTo mount your server in a cabinet:1 Remove the two screws from each handle, then set the handles and screws aside.2 Align the slots i

Strona 81 - Installing a processor

iwww.gateway.comContents1 Checking Out Your Gateway Server. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1Front . . . . . .

Strona 82

15www.gateway.com4 Place a disk guide over the disk guide screw hole towards the back of the server.5 Install a small screw through the disk guide and

Strona 83

16www.gateway.com6 Attach a nut bar to the inside of the two back cabinet posts using medium screws, but do not completely tighten the screws (leave t

Strona 84

17www.gateway.com8 With the front of the server facing you, lift the server and insert it into the cabinet from the front, then position the disk guid

Strona 85 - Replacing the power supply

18www.gateway.comInstalling the bezelTo install the bezel:1 With the server pulled out from the cabinet, align the holes in the handle with the holes

Strona 86

19www.gateway.com6 Use a screw through each handle to secure the server to the cabinet posts.7 Remove the bezel lock keys from the inside of the bezel

Strona 87

20www.gateway.comStarting your serverBefore you start your server for the first time: Make sure that the server and monitor are plugged into a power

Strona 88

21www.gateway.comIf nothing happens when you press the power button: Make sure that the power cable is plugged in securely and that your surge protec

Strona 89 - Replacing the CMOS battery

22www.gateway.comTurning off your serverEvery time you turn off your server, first shut down the operating system. You may lose data if you do not fol

Strona 90

23www.gateway.comConfiguring the RJ-45 serial portThe RJ-45 serial port connector can be configured to support either a Data Set Ready (DSR), or a Dat

Strona 91 - Replacing the control panel

24www.gateway.comSetting up the operating systemIf you ordered your server with the operating system already installed by Gateway, in most cases it is

Strona 92

iiwww.gateway.com4 Installing Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35Preparing

Strona 93 - Replacing the system board

Chapter 325Maintaining Your Server Caring for your server Recording the BIOS configuration Managing your server and network

Strona 94

26www.gateway.comCaring for your serverTo extend the life of your server: Be careful not to bump or drop your server. When transporting your server,

Strona 95

27www.gateway.com Use a damp, lint-free cloth to clean your server and other parts of your server system. Do not use abrasive or solvent cleaners bec

Strona 96 - Chapter 5

28www.gateway.comPreparing for system recoveryIf your system files are corrupted, you may not be able to start the server from the hard drive. Startup

Strona 97 - 2 Select one of these menus:

29www.gateway.comSystem administrationGateway Systems ManagerGateway Systems Manager lets you manage multiple computers on a Windows™ network from a s

Strona 98 - Updating the BIOS

30www.gateway.com4 Type the password and press ENTER, then type it again and press ENTER.5 Save your changes and close the BIOS Setup utility.To remov

Strona 99 - Recovering the BIOS

31www.gateway.comIdentifying your serverWhile you are working on a cabinet that contains several slim servers, it can be difficult to keep track of wh

Strona 100 - To manually recover the BIOS:

32www.gateway.comUpdating the baseboard management controller firmwareThe baseboard management controller (BMC) performs several system management fun

Strona 101

33www.gateway.com3 When the System Companion CD menu opens, select the FRU/SDR utility.4 Select one of the following options (if in doubt, choose the

Strona 103 - Resetting BIOS passwords

iiiwww.gateway.comBefore calling Gateway Customer Care . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 102Telephone support .

Strona 104

Chapter 435Installing Components Opening and closing the server case Installing and replacing major server components

Strona 105

36www.gateway.comPreparing to install componentsSelecting a place to workWork on your server in an area that: Is clean (avoid dusty areas) Is a low-

Strona 106 - Chapter 6

37www.gateway.comPreventing static electricity dischargeThe components inside your server are extremely sensitive to static electricity, also known as

Strona 107 - Telephone support

38www.gateway.comOpening the server caseBecause the components inside your server are extremely sensitive to static electricity, make sure that you fo

Strona 108 - Tutoring and training

39www.gateway.com6 Press and hold the panel release button, then slide the top panel toward the back of the server about 1/2 inch.7 Lift the top panel

Strona 109 - Safety guidelines

40www.gateway.com3 Slide the top panel toward the front of the server until it clicks into place.4 Replace the shipping screw (if required).5 Replace

Strona 110 - Error messages

41www.gateway.comRemoving and installing air ducts, air dams, and baffleYour server has been engineered to provide correct airflow in the chassis for

Strona 111 - System Event Log Full

42www.gateway.comInstalling the processor air ductTo install the processor air duct:1 Place the processor air duct over the CPU sockets. The front edg

Strona 112 - Troubleshooting

43www.gateway.com3 Pull up on the air baffle to remove it from the server chassis.Important Take note of the cable routing under and around the air ba

Strona 113 - Beep codes

44www.gateway.comInstalling the air baffleTo install the air baffle:1 Place the air baffle into the chassis between the power supply and the hot-swap

Strona 114

ivwww.gateway.com

Strona 115 - Diagnostic LEDs

45www.gateway.comInstalling and removing drivesYour server’s basic configuration includes one CD or DVD drive and as many as three SATA fixed hard dri

Strona 116 - POST code checkpoints

46www.gateway.com5 Remove the rails from the diskette drive conversion kit carrier by removing the four screws that secure the rails to the carrier.6

Strona 117

47www.gateway.com8 Reattach the rails to the sides of the carrier with the four screws you previously removed.9 Open the connector on the back of the

Strona 118 - Description

48www.gateway.com12 Open the connector labeled Floppy Con on the backplane by pulling up on the connector cover.13 Insert the other end of the diskett

Strona 119

49www.gateway.comRemoving a diskette drive from the converted hard drive bayTo remove a diskette drive from the converted drive bay:1 Follow the instr

Strona 120

50www.gateway.comInstalling a CD or DVD driveTo install a CD or DVD drive:1 Follow the instructions in “Preventing static electricity discharge” on pa

Strona 121

51www.gateway.com6 Align the connector on the interposer board with the connector on the back of the CD or DVD drive, then attach the board to the dri

Strona 122 - ACPI runtime checkpoints

52www.gateway.comRemoving a CD or DVD driveTo removing a CD or DVD drive:1 Follow the instructions in “Preventing static electricity discharge” on pag

Strona 123 - Diskette drive

53www.gateway.comInstalling or replacing a hard driveUse this procedure to add or replace hard drives in a drive bay. Your server supports as many as

Strona 124 - Hard drive

54www.gateway.com5 Remove the four screws that attach the plastic retention device or the previously installed hard drive to the drive carrier. Two sc

Strona 125 - Modem (telephone dial-up)

Chapter 11Checking Out Your GatewayServer Locating drives, ports, jacks, and controls Locating system board components Available help resources

Strona 126

55www.gateway.com9 If it is not already installed, connect the SATA power cable adapter (supplied with the fixed drive kit) to the 3x2 power supply ca

Strona 127 - The color is not uniform

56www.gateway.com11 Connect the loose end of the data cable to the rear of the SATA drive.Air baffle tabAir baffle back cutoutAir baffle cutoutAir baf

Strona 128 - Processor

57www.gateway.com12 Connect the SATA power cable adapter end(s) to the rear of the SATA drive.13 Reinstall the bezel, if required, by snapping it into

Strona 129

58www.gateway.comRemoving a fixed SATA hard driveUse these instructions only if you have installed the fixed drive kit.To remove a fixed SATA hard dri

Strona 130 - Appendix A

59www.gateway.comInstalling a hot-swap hard driveTo install a hot-swap hard drive:1 Unlock the bezel (if necessary) and remove it by pulling it from t

Strona 131 - System specifications

60www.gateway.comIf you are adding a new drive, remove the four screws that secure the hard drive spacer to the drive tray, then remove the spacer fro

Strona 132 - System board specifications

61www.gateway.comConfiguring your onboard RAID solutionYour server comes equipped with an onboard, chipset SATA RAID solution, which supports RAID lev

Strona 133 - Environmental specifications

62www.gateway.com9 Press and hold the CTRL key, then press the E key. The RAID BIOS console will open.10 Configure the RAID options, then exit the RAI

Strona 134 - Additional specifications

63www.gateway.com5 Press the SPACEBAR to select the array. The Logical Drive Configuration screen opens.6 Select the physical drives to associate with

Strona 135

64www.gateway.comFilling empty drive baysEmpty drive bays in the server must be filled by filler panels, empty drive carriers, or empty drive trays, a

Strona 136 - Appendix B

2www.gateway.comFrontControl panelHard driveControl panelCD or DVDdriveHard driveHard driveSystem fault LEDHard drive activity LEDVideo portLAN 1 acti

Strona 137 - 1 Restart your server

65www.gateway.comInstalling memoryYour server supports from 256 MB to 12 GB* of total DDR333 or DDR266 memory. Supported DIMM sizes include 256MB, 512

Strona 138

66www.gateway.comMemory online sparingThe chipset on the system board in the Gateway 9315 supports memory online sparing, which can provide a way to p

Strona 139

67www.gateway.commaintained as a spare, only 75% of the installed memory is usable. For example, if six 2 GB DIMMs are installed, only four are active

Strona 140

68www.gateway.com6 Turn on the server, then make sure that the operating system completely loads. If you receive an error, see “Memory” on page 120.7

Strona 141

69www.gateway.comRemoving and Installing PCI expansion cardsRemoving and installing the PCI riser assemblyTo remove and install the PCI riser assembly

Strona 142

70www.gateway.com5 If you are installing or replacing a PCI expansion card, follow the instructions in “Removing and installing a PCI expansion card”

Strona 143

71www.gateway.comRemoving and installing a PCI expansion cardTo remove and install a PCI expansion card:1 Follow the instructions in “Preventing stati

Strona 144 - Security

72www.gateway.com8 Install the PCI riser assembly back into the server by following the instructions in “Removing and installing the PCI riser assembl

Strona 145

73www.gateway.com5 Push back on the blue release lever at the end of the PCI riser connector. While holding the lever back, push firmly on the other e

Strona 146

74www.gateway.com9 Slide the PCI riser connector to the right to lock it into place, then release the blue locking lever.10 Install PCI expansion card

Strona 147 - Server (Cont’d)

3www.gateway.comBackI/O panelLow-profile PCI expansion cardI/O panelFull-height PCI expansion cardPower supplyPower connectorSerial numberVideo portUS

Strona 148

75www.gateway.comReplacing a system fanTo replace the fan module:1 Follow the instructions in “Preventing static electricity discharge” on page 37. Ma

Strona 149

76www.gateway.comInstalling a processorThe 9315 server is compatible with Intel® Xeon processors with a front side bus frequency of 800 MHz and a mini

Strona 150

77www.gateway.com5 If you are installing a processor, proceed to Step 7.- OR -If you are replacing a processor, loosen the four captive screws on the

Strona 151 - Setting Value

78www.gateway.com7 If you are installing a second processor for the first time, remove the air dam from the processor air duct.8 Before inserting the

Strona 152 - Appendix C

79www.gateway.com9 Install the new processor into the CPU socket, then press the processor locking lever down until it lays flat against the CPU socke

Strona 153 - Important safety information

80www.gateway.comReplacing the power supplyTo replace the power supply:1 Follow the instructions in “Preventing static electricity discharge” on page

Strona 154

81www.gateway.com6 Lift the front edge of the power supply, then pull it toward the front of the server to disengage it from the retention clips at th

Strona 155 - United States of America

82www.gateway.comInstalling or replacing the hot-swap backplaneYour server may not have a hot-swap backplane. If your server was ordered with fixed dr

Strona 156 - Industry Canada (IC)

83www.gateway.com7 Loosen the blue captive screw on the right side of the backplane, then slide the backplane to the right until it stops.8 Lift the b

Strona 157

84www.gateway.comReplacing the CMOS batteryIf the server clock does not keep time or the settings in the BIOS Setup utility are not saved when you tur

Strona 158 - Laser safety statement

4www.gateway.comInteriorDIMM slotsPCI riser assemblyPower supplyCPU 1 socketProcessor air ductCPU 2 socketDrive baysFan module

Strona 159 - Trademark Acknowledgments

85www.gateway.com7 Push the battery retention clip away from the battery until the battery lifts up, then remove the old battery. You can use a screwd

Strona 160

86www.gateway.comReplacing the control panelTo replace the control panel:1 Follow the instructions in “Preventing static electricity discharge” on pag

Strona 161

87www.gateway.com6 Slide the replacement control panel into the server far enough to connect the front panel and USB cables. If you disconnected the c

Strona 162

88www.gateway.comReplacing the system boardTo replace the system board:1 Follow the instructions in “Preventing static electricity discharge” on page

Strona 163

89www.gateway.com9 Slide the system board toward the front of the server. If the board is difficult to move, push on the back I/O port panel for added

Strona 164

90www.gateway.com13 Reinstall the memory by following the instructions in “Installing memory” on page 65.14 Reinstall the processors by following the

Strona 165

Chapter 591Using the BIOS Setup Utility Opening the BIOS Setup utility Updating the BIOS Resetting the BIOS settings to their factory defaults Res

Strona 166

92www.gateway.comOpening the BIOS Setup utilityThe BIOS Setup utility stores basic settings for your server. These settings include basic hardware con

Strona 167

93www.gateway.comUpdating the BIOSIf you need a new version of the BIOS, you can download the BIOS update from Gateway, then install the new version f

Strona 168

94www.gateway.com3 Remove the jumper across pins 1-2 of jumper J1A4 (at the left back of the system board), then place the jumper across pins 2-3.4 Fo

Komentarze do niniejszej Instrukcji

Brak uwag