Converting to rackmount 53Beginning at the top left inside edge of the bezel, depress the plastic retention tabs toward the outside edge of t
6 InstallationRemoving the feet To remove the feet:1 Turn the server upside down.2 Using a flat-bladed screwdriver, remove the screws securin
Converting to rackmount 7Installing the chassis handles To install the chassis handles:1 Place the server on its side, like it will be instal
8 InstallationInstalling the system drawer side railsBefore installing the server (system drawer) in the cabinet, you need to install the sys
Installing the cabinet mounting brackets and mounting rails 9Installing the cabinet mounting brackets and mounting railsIf you are installing
10 Installation3 Attach the front mounting bracket to the front vertical mounting rail using two screws from the accessory kit.4 Position the
Installing the cabinet mounting brackets and mounting rails 11Installing the cabinet mounting rails onto Gateway brackets To install the cabi
12 Installation3 Align the front of the cabinet mounting rail to the front mounting bracket by sliding the inner rail and inner slide until t
Installing the cabinet mounting brackets and mounting rails 13Installing generic mounting bracketsIf you are installing the server in a non-G
14 Installation4 Position the back mounting bracket (longer bracket) on the back vertical mounting rail.5 Attach the back mounting bracket to
iContentsPreface. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . i
Installing the cabinet mounting brackets and mounting rails 152Attach the back end of the cabinet mounting rail to the back mounting bracket
16 InstallationMounting the system drawer in the cabinet To mount the system drawer in the cabinet:1 Pull both of the inner rails forward unt
Mounting the system drawer in the cabinet 173Lift the system drawer to the same height as the inner rails, then align the system drawer side
18 Installation5 Press the latches on both sides of the system drawer side rails, then push the system drawer back until the inner rail sprin
Installing the cable retractor 19Installing the cable retractorCable retractors reduce strain on the drawer cables and connectors and simplif
20 InstallationInstalling a cable retractor in a non-Gateway cabinet To install a cable retractor in a non-Gateway cabinet:1 Remove the adapt
Completing the connections 21Attaching the cables to the retractor To attach the cables:1 Route the cables from the back of the system drawer
22 InstallationConnecting a single system drawer To connect the peripherals:1 Turn off all system drawers and devices in the cabinet before a
Completing the connections 23Connecting multiple system drawersMultiple system drawers installed in a cabinet can share a single set of perip
24 InstallationThe system I/O connectors may appear different than in the illustration, depending on the system board installed in the server
ii NoticesCopyright © 2000 Gateway, Inc.All Rights Reserved4545 Town Centre CourtSan Diego, CA 92121 USAAll rights reservedThis publication i
Completing the connections 25Connecting the powerGateway recommends that a licensed electrician install a dedicated 230 VAC line, with suffic
26 InstallationIf rack mounted units are installed in a closed or multi-rack cabinet, they may require further evaluation by Certification Ag
Turning off the system drawer 277When the system drawer starts successfully, install the operating system, if necessary.8 Turn on the other s
28 InstallationSecuring the system drawer in the cabinet To secure the system drawer:1 Close the back door of the system cabinet, then lock i
8400 Server Rackmount Installation GuideA MAN US 8400 RACK GDE R0 5/00
Conventions used in this manual iiiPrefaceConventions used in this manualThroughout this manual, you will see the following conventions:Conve
iv Information about your systemAccessing the server system manualA comprehensive 8400 Server System Manual is located on the Server Companio
11InstallationThis guide provides information on converting your Gateway server to a rackmount configuration and installing your Gateway ser
2 InstallationConverting to rackmountTo convert the server to a standard 19-inch (48.26 cm) rack-mountable drawer, you need to remove the unn
Converting to rackmount 35Remove the two screws securing the front access panel to the chassis.6 Slide the front access panel to the back and
4 InstallationChanging the bezel To remove the tower bezel:1 With the tower in the upright position, open the system door and lift the door s
Komentarze do niniejszej Instrukcji